News

RailTech.com
railtech.com > all > 03/24/2026 > glasgow-central-resumes-timetabled-operations-2-weeks-after-fire

Glasgow Central resumes timetabled operations 2 weeks after fire

6+ hour, 37+ min ago  (181+ words) More than two weeks after a devastating fire, Scotland's busiest station is resuming a full timetable of operations. Glasgow Central was completely closed after a huge blaze in an adjoining building, which began on Saturday, 7 March. The burnt-out remains of…...

RailTech.com
railtech.com > all > 03/16/2026 > glasgow-central-set-to-reopen-after-devastating-blaze

Glasgow Central set to reopen after devastating blaze

1+ week, 1+ day ago  (193+ words) The UK's national infrastructure agency, Network Rail, is targeting Wednesday to reopen Scotland's busiest station. Glasgow Central has been closed since a huge fire last weekend destroyed an adjacent building. Now, with the fire out and demolition of the burnout…...

RailTech.com
railtech.com > all > 03/08/2026 > fire-closes-glasgow-central-station

Fire closes Glasgow Central Station

2+ week, 1+ day ago  (124+ words) Simon Walton is UK Editor for RailTech.com and Railfreight.com Dutch Railways (NS) reported a profit from passenger transport over 2025 for the first time since 2019, but its debt has risen to 1.2 billion euros. The rail" On the 3rd of September…...

RailTech.com
railtech.com > all > 01/15/2026 > copenhagen-on-track-for-full-automation-as-siemens-and-stadler-seal-e3bn-deal-for-driverless-s-trains

Copenhagen on track for full automation as Siemens and Stadler seal €3bn deal for driverless S-trains

2+ mon, 1+ week ago  (183+ words) Danish state operator DSB has awarded a Siemens Mobility'Stadler consortium a contract worth about "3.08bn (DKK 23bn) to supply at least 226 new driverless electric S-train sets for Copenhagen. A massive shakeup for the Danish capital, the deal is designed to move the…...